Water treatment (WTP)
- Water desalination Egypt
- Water desalination UAE
- Sortaval WTP Russian
- Kenna WTP, Egypt
- Kallaheen WTP, Egypt
- Gamassa WTP, Egypt
- Smart Village, Egypt
- New Cairo WTP Consultant, Egypt
All The project are consists of the following main:
- Raw water
- Treated pumping house
- Filter and back wash building
- Under ground Tank
- Main MIMIC
Raw water is pumped from Nile via the pump station which is far from the plant about 5 km to the Water Treatment Plant (WTP) through three from the 1200 mms pipelines, raw water booster pumping station is located midway between intake ( 1400 l/Sec pumps) and WTP. The water treatment plant is composed of 3 lines, of 150 00, 400 000 and 800 000 m3/day.
pumped to the reservoirs of pumping station. Water then is pumped to the reservoirs of pumping station. The next step after the raw water “lift station) comes the Treated water Station which is consists of 2 pumps, working Manual/Automatic from the control panel and standalone by the PLC.